Other Charts

Hardik Chheda Updated by Hardik Chheda

In Tellius, you can change your chart to different charts by switching the chart to the available chart.

  1. From the Vizpads page, open the Vizpad.
  2. On the Vizpad page, click the Switch Chart icon on the chart panel.
  3. In the Charts panel, select the chart opton to change the chart to the required chart.
  4. At the top-right corner, click the Edit button to change the chart configurations and change the measures and dimensions.
  5. From the Business View panel, drag the fields to the Measure and Dimension fields.
    For more information about chart configuration, see Create Visualization Chart and Configure Chart Panel.

    Table Chart

    Radical Progress

    Funnel Chart

    Waterfall Chart

Did we help you?

Scatter Chart

Cumulative line chart

Contact